MANITOBA HYDRO PLANT SITE

MANITOBA HYDRO PLANT SITE

"Power for Inco's northern Manitoba operations will be generated in a new plant at Grand Rapid, on the Nelson River, shown above. Second largest of the Manitoba Hydro Board chain, the $35,000,000 plant will be built In the area already readied on the far side of the river. At the foot of the point on this side of the rapid a power shovel can be seen working on excavation for the spillway. In the foreground is the terminus of the 12-mile spur built last.”  (Inco Triangle, Volume 17, Copper Cliff, Ontario, July, 1957, No. 4, p. 9.)